II. Periodic Maintenance (Weekly/Monthly/Quarterly)
1. Weekly Maintenance
- Clean electrical cabinet ventilation filters to prevent dust accumulation and overheating.
- Check hydraulic/pneumatic system pressure for stability and inspect pipelines for leaks.
- Remove sediment from coolant tank and verify concentration and pH levels.
2. Monthly Maintenance
- Guide rails & ball screws: Clean with kerosene or specialized solvent, then relubricate; inspect for wear or scoring.
- Spindle system: Check taper cleanliness and apply light rust-preventive oil.
- Electrical system: Inspect cables and connectors for looseness, and verify proper grounding.
3. Quarterly Maintenance
- Hydraulic system: Replace or filter hydraulic oil and clean the reservoir.
- Accuracy calibration: Verify machine geometry (e.g., levelness, spindle runout, backlash).
- Data backup: Save CNC parameters and PLC programs to prevent data loss.